Commercial infrastructure
Commercial EV Charging Infrastructure
Electrifying a property is an infrastructure project, not a hardware purchase. We design and build the electrical backbone: service capacity, make-ready wiring, charger circuits, and a phasing plan that matches how your site will actually grow.
Load studies and capacity planning
A real load study of your service and panels determines how many chargers your site supports today and what unlocks the next phase. Load management can multiply usable capacity before a service upgrade is needed.
Make-ready construction
Panels, conduit, wire pulls, and stub-outs built once and sized for the full buildout, so adding the next bank of chargers is an electrician visit rather than a construction project.
Level 2 and DC fast-charge circuits
From workplace Level 2 banks to DC fast charging with utility coordination, circuits are engineered for the equipment you choose and installed inspection-ready.
Utility programs and incentives
Utility make-ready programs like SCE Charge Ready can offset significant infrastructure cost for qualifying sites. These programs set their own installer rules, including EVITP-certified electricians on program-funded crews, so eligibility and program requirements are reviewed as part of every commercial estimate before anything is promised.
Who this is for
Property managers, HOA boards, employers, fleet operators, and developers across Southern California.
TLC Electrical, based in Huntington Beach, California. CSLB License #1154997 | C-10 Electrical Contractor
Other services
Where we work
City guides to local permits and utility incentives:
Estimates are free and photo uploads make them faster.
Request an estimateQuestions first? See the FAQ.